Company Profile 2024
Introduction
Sanai Holdings Limited was incorporated on 7th June 2014 as a Building and Civil Engineering contractor. Through the years it has grown to be an integrated construction company with support operations in Logistics, production of crushed stone aggregates, asphaltic concrete batching, mining natural gravels, and manufacture of common precast concrete units.
A wealth of experience, wide integration and comprehensive inventory of equipment and construction machinery has made Sanai Holdings Limited one of the largest contractors regionally; Certified by the National Construction Authority for Road Works, Building works and Water works.
The company's headquarters are situated along Sach Angwan Road, Benin Building in Kabarnet. Sanai Holdings Limited is well known nationally and is a member of the Kenya Association of Building and Civil Engineering Contractors (KABCEC), and The Roads and Civil Engineering Contractors Association (RACECA).
Mission Statement
What? Construction building service.
To Whom? Industrial and commercial concerns.
How? By invitation to tender or referrals.
Based on? Providing a reliable, warrantable product/service that will stand the test of time.
Vision
- To be the first-choice civil engineering firm nationally, with a focus on infrastructure and heavy industries.
- To supply the best quality crushed aggregates, premix asphalt and concrete to large-scale projects.
- To continuously enhance and build a strong management/technical team to strive towards a sustainable, environmentally friendly engineering approach with utmost care for the people and their surrounding environment.
Particulars
Physical Address: Benin Plaza, Benin.
Postal Address: P. O. Box 333 – 30400 Kabarnet
Email: info@sanai-africa.org
Tel: (+254) 704 930 722
KRA Pin: P051500889L
Co. Reg. No: CPR/2014/145800
NCA Details: ROAD WORKS - NCA 6, WATER WORKS - NCA 6, BUILDING WORKS - NCA 6
What We Do
Road & Highway Construction
Site clearance, sub-base/base formation, soil-stabilization, asphaltic concrete laying and surface dressing, AC overlays, bridges and box culverts, storm drainage systems.
Yard Construction
Natural gravel or Graded crushed stone bases, Fibre Reinforced Concrete and RCC hardstanding areas, Paving block surface (Cabro), Asphaltic concrete surface.
Building Construction
Hotel/apartment complex, warehouses, housing developments and private homes, perimeter walls, etc.
Schedule of Major Works Carried Out
| No | Contract Identification/Description | Name of Employer | Contract Amount (KES) |
|---|---|---|---|
| 1 | CONSTRUCTION OF 100 BED ROOMS HOTEL IN NORTH COAST SEVERIN SEA LODGE | Contractor | 18,500,000.00 |
| 2 | CONSTRUCTION OF 100 BED ROOMS HOTEL IN NORTH COAST - PLAZA BEACH HOTEL | HOLIDAY CENTRES LTD | 22,417,615.00 |
| 93 | CONSTRUCTION TO BITUMEN STANDARD OF MARIAKANI - KALOLENI ROAD (107) RD | KENYA NATIONAL HIGHWAYS AUTHORITY | 1,606,612,965.00 |
| 116 | RECONSTRUCTION OF TAXIWAY AND APRON MANDA AIRPORT LAMU | KENYA AIRPORTS AUTHORITY | 121,726,189.00 |
SANAI